SSY Offshore Wind Portal
Wind farms
German North Sea

Waterkant

Luxcara / Waterkant Energy

Install
Schedule
FID / pre-install
Install window
WTG T&I spring 2028 (16x 18.5 MW)
COD / first power
~270 MW (COD not disclosed)
Open vessel demand
What is still unnamed on this farm.

Which DEME/Havfram hull (Norse Wind vs Norse Energi) for spring 2028; foundation/cable/SOV not disclosed

Who to call: Luxcara / DEME
Packages
Contractor per scope. Blank = not disclosed.
Foundation T&I
not disclosed
Turbine T&I
Havfram / DEME (one newbuild WTIV; hull not named)
Array cable
not disclosed
Export cable
not disclosed
O&M / SOV contractor
not disclosed
Named vessels
0 hulls stamped on this farm.

No hulls named yet.

Fixtures & open campaigns on this farm
1 lines from the wind fixture book.
DateHullClassStatus
2028-springunnamed (one Havfram/DEME newbuild)
DEME
WTIV / installationOpen — pitch
pitch — which hull
Source: Luxcara 25 Sep 2024; Havfram / OffshoreWIND.bizluxcara.comLogged 2026-08-14