Denmark North Sea

Thor

RWE (51%) / Norges Bank Investment Management (49%)

Install
Schedule
install
Install window
Remaining 36 of 72 WTG by end-2026 (Brave Tern)
COD / first power
First power Mar 2026; full COD spring 2027
Open vessel demand
What is still unnamed on this farm.

FOW hull freed after Thor — next fixture

Who to call: RWE Thor project / Fred. Olsen Windcarrier
Packages
Contractor per scope. Blank = not disclosed.
Foundation T&I
Jan De Nul (Les Alizés; MP done 2025). Secondary steel Van Oord MPI Adventure (done)
Turbine T&I
Fred. Olsen Windcarrier
Array cable
not disclosed
Export cable
not disclosed
O&M / SOV contractor
RWE O&M from Thorsminde (in-house)
Named vessels
2 hulls stamped on this farm.
Fixtures & open campaigns on this farm
1 lines from the wind fixture book.
DateHullClassStatus
2026-03Brave Tern
Fred. Olsen Windcarrier
WTIV / installationIn-house
covered — hull frees end-2026
Source: RWE Thor 17 Jul 2026; thor.rwe.com project pagethor.rwe.comLogged 2026-08-14