German North Sea
Nordlicht II
Vattenfall (51%) / BASF (49%)
FID
Schedule
FID
Install window
Construction from 2027; WTG summer 2028 (44x V236-15 MW)
COD / first power
COD 2028–2029 (sources differ; Vattenfall Jul 2026 says cluster 2028)
Open vessel demand
What is still unnamed on this farm.
Which WTIV hull summer 2028; CSOV/SOV and export package not disclosed
Who to call: Vattenfall BA Wind / DEME
Packages
Contractor per scope. Blank = not disclosed.
Foundation T&I
DEME
Turbine T&I
Havfram / DEME (one newbuild WTIV; hull not named)
Array cable
Jan De Nul (Connector)
Export cable
not disclosed
O&M / SOV contractor
not disclosed
Named vessels
0 hulls stamped on this farm.
No hulls named yet.
Fixtures & open campaigns on this farm
2 lines from the wind fixture book.
| Date | Hull | Class | Charterer / contractor | Window | Status |
|---|---|---|---|---|---|
| 2028-summer | unnamed (one Havfram/DEME newbuild) DEME | WTIV / installation | Havfram / DEME (Vattenfall) | 44x 15 MW from summer 2028 | Open — pitch pitch — which hull |
| 2027-summer | unnamed (one Havfram/DEME newbuild) DEME | WTIV / installation | Havfram / DEME (Vattenfall) | 68x 15 MW from summer 2027 | Open — pitch pitch — which hull |