Hollandse Kust West VI (Ecowende)

Shell / Eneco / Chubu Electric Power

Install
Schedule
install
Install window
Foundations done spring 2026; WTG from 30 May 2026 (52x V236-15 MW)
COD / first power
COD end-2026
Open vessel demand
What is still unnamed on this farm.

Late-2026 commissioning CTV/SOV if not already covered

Who to call: Ecowende / Van Oord / Shell
Packages
Contractor per scope. Blank = not disclosed.
Foundation T&I
Van Oord
Turbine T&I
Van Oord
Array cable
Van Oord (Nexus; TKF supply)
Export cable
TenneT grid
O&M / SOV contractor
not disclosed
Named vessels
2 hulls stamped on this farm.
Fixtures & open campaigns on this farm
1 lines from the wind fixture book.
DateHullClassStatus
2026-05-30Boreas
Van Oord
WTIV / installationIn-house
covered
Source: OffshoreWIND.biz 1 Jun 2026offshorewind.bizLogged 2026-08-14